(817) 370-0612

Blackbeard Operating, LLC Drilling Permit Activity

Quick answer: Blackbeard Operating, LLC has 1,696 Texas/Oklahoma drilling permits in the last ten years, 118 of them in the last 12 complete months (-29.3% year over year). Its most-permitted county is Crane (75.9% of permits) and leading target is Permian Basin (52.5%).

118
permits, last 12 complete months
-29.3%
vs prior 12 months
1,696
permits, last 10 years
September 2026
most recent permit month

The most recent permit month is the current, partial month, which the 12-month count does not include yet.

Permits by year

2017: 72 permits 2017 2018: 68 permits 2019: 132 permits 2019 2020: 122 permits 2021: 211 permits 2021 2022: 345 permits 2023: 305 permits 2023 2024: 194 permits 2025: 155 permits 2025 2026: 89 permits 2026
Blackbeard Operating, LLC drilling permits per year (years with 3+ permits) (permits)
Blackbeard Operating, LLC drilling permits per year (years with 3+ permits)
Periodpermits
201772
201868
2019132
2020122
2021211
2022345
2023305
2024194
2025155
202689
YearPermitsMedian lateral (ft)
201772147
201868670
2019132146
2020122146
2021211146
20223451,702
20233051,763
20241947,598
20251557,153
2026896,889

Where it permits

CountyPermitsShare
Crane (TX)1,28875.9%
Winkler (TX)38422.6%
Ward (TX)110.6%
Atoka (OK)60.4%
Hemphill (TX)30.2%
Hughes (OK)30.2%
All other counties1—

What it targets

Formation / playPermitsShare
Permian Basin80652.5%
Thirty-One Carbonate-Chert71746.7%
Ouachita Folded Belt60.4%
Anadarko Basin40.3%
Chautauqua Platform30.2%

Permit-to-production timing

Median permit → spud42 days
Median spud → first reported production34 days
Permits older than 12 months that were spudded80.1%
Spuds older than 12 months reporting production90.1%
Median lateral, last 24 months vs earlier7,334 ft vs 603 ft

Groups with fewer than three permits are folded into "all other". Computed by Valor from public oil and gas data; refreshed weekly. Data as of 2026-09-29.

Using this page

Blackbeard Operating, LLC Permits — FAQ

Blackbeard Operating, LLC has 1,696 Texas/Oklahoma drilling permits in the last ten years, 118 of them in the last 12 complete months (-29.3% year over year). Its most-permitted county is Crane (75.9% of permits) and leading target is Permian Basin (52.5%).

Across its permits, the median time from permit to spud is 42 days and from spud to first reported production 34 days. 80.1% of its permits older than a year have been spudded.

Its median lateral on permits from the last 24 months is 7,334 ft, versus 603 ft on earlier permits (+1116.3%).

No. Valor publishes permit activity as statistics — counts by year, county and formation groupings of three or more permits, lateral trends and cycle times — rather than individual permit records.

These statistics are computed by Valor from public oil and gas data. © Valor, all rights reserved.