Highpeak Energy Holdings, LLC Drilling Permit Activity

Quick answer: Highpeak Energy Holdings, LLC has 755 Texas/Oklahoma drilling permits in the last ten years, 55 of them in the last 12 complete months (-43.3% year over year). Its most-permitted county is Howard (70.5% of permits) and leading target is Permian Basin (100%).

55
permits, last 12 complete months
-43.3%
vs prior 12 months
755
permits, last 10 years
November 2026
most recent permit month

The most recent permit month is the current, partial month, which the 12-month count does not include yet.

Permits by year

2017: 29 permits 2017 2018: 15 permits 2019: 24 permits 2019 2020: 33 permits 2021: 76 permits 2021 2022: 207 permits 2023: 98 permits 2023 2024: 139 permits 2025: 85 permits 2025 2026: 48 permits 2026
Highpeak Energy Holdings, LLC drilling permits per year (years with 3+ permits) (permits)
Highpeak Energy Holdings, LLC drilling permits per year (years with 3+ permits)
Periodpermits
201729
201815
201924
202033
202176
2022207
202398
2024139
202585
202648
YearPermitsMedian lateral (ft)
201729350
2018154,718
20192410,344
20203311,026
20217611,108
202220710,945
20239810,922
202413910,397
20258510,083
20264811,024

Where it permits

CountyPermitsShare
Howard (TX)53270.5%
Borden (TX)20627.3%
Mitchell (TX)91.2%
Scurry (TX)81.1%

What it targets

Formation / playPermitsShare
Permian Basin689100%

Permit-to-production timing

Median permit → spud19 days
Median spud → first reported production162 days
Permits older than 12 months that were spudded79.3%
Spuds older than 12 months reporting production81.5%
Median lateral, last 24 months vs earlier10,960 ft vs 10,571 ft

Groups with fewer than three permits are folded into "all other". Computed by Valor from public oil and gas data; refreshed weekly. Data as of 2026-11-22.

Using this page

Highpeak Energy Holdings, LLC Permits — FAQ

Highpeak Energy Holdings, LLC has 755 Texas/Oklahoma drilling permits in the last ten years, 55 of them in the last 12 complete months (-43.3% year over year). Its most-permitted county is Howard (70.5% of permits) and leading target is Permian Basin (100%).

Across its permits, the median time from permit to spud is 19 days and from spud to first reported production 162 days. 79.3% of its permits older than a year have been spudded.

Its median lateral on permits from the last 24 months is 10,960 ft, versus 10,571 ft on earlier permits (+3.7%).

No. Valor publishes permit activity as statistics — counts by year, county and formation groupings of three or more permits, lateral trends and cycle times — rather than individual permit records.

These statistics are computed by Valor from public oil and gas data. © Valor, all rights reserved.