Pdeh LLC Drilling Permit Activity

Quick answer: Pdeh LLC has 682 Texas/Oklahoma drilling permits in the last ten years, 80 of them in the last 12 complete months (-36.5% year over year). Its most-permitted county is Loving (87.7% of permits) and leading target is Avalon-Bone Spring (58.1%).

80
permits, last 12 complete months
-36.5%
vs prior 12 months
682
permits, last 10 years
November 2026
most recent permit month

The most recent permit month is the current, partial month, which the 12-month count does not include yet.

Permits by year

2017: 60 permits 2017 2018: 69 permits 2019: 74 permits 2019 2020: 62 permits 2021: 9 permits 2021 2022: 74 permits 2023: 72 permits 2023 2024: 54 permits 2025: 129 permits 2025 2026: 70 permits 2026
Pdeh LLC drilling permits per year (years with 3+ permits) (permits)
Pdeh LLC drilling permits per year (years with 3+ permits)
Periodpermits
201760
201869
201974
202062
20219
202274
202372
202454
2025129
202670
YearPermitsMedian lateral (ft)
2017607,685
2018696,535
2019745,904
2020629,759
2021911,268
20227410,172
2023729,768
20245410,132
20251299,724
20267010,599

Where it permits

CountyPermitsShare
Loving (TX)59887.7%
Winkler (TX)669.7%
Ward (TX)182.6%

What it targets

Formation / playPermitsShare
Avalon-Bone Spring39258.1%
Permian Basin28341.9%

Permit-to-production timing

Median permit → spud94 days
Median spud → first reported production214 days
Permits older than 12 months that were spudded96.1%
Spuds older than 12 months reporting production92.6%
Median lateral, last 24 months vs earlier10,007 ft vs 9,125 ft

Groups with fewer than three permits are folded into "all other". Computed by Valor from public oil and gas data; refreshed weekly. Data as of 2026-11-22.

Using this page

Pdeh LLC Permits — FAQ

Pdeh LLC has 682 Texas/Oklahoma drilling permits in the last ten years, 80 of them in the last 12 complete months (-36.5% year over year). Its most-permitted county is Loving (87.7% of permits) and leading target is Avalon-Bone Spring (58.1%).

Across its permits, the median time from permit to spud is 94 days and from spud to first reported production 214 days. 96.1% of its permits older than a year have been spudded.

Its median lateral on permits from the last 24 months is 10,007 ft, versus 9,125 ft on earlier permits (+9.7%).

No. Valor publishes permit activity as statistics — counts by year, county and formation groupings of three or more permits, lateral trends and cycle times — rather than individual permit records.

These statistics are computed by Valor from public oil and gas data. © Valor, all rights reserved.