Vtx Energy Operating, LLC Drilling Permit Activity

Quick answer: Vtx Energy Operating, LLC has 366 Texas/Oklahoma drilling permits in the last ten years, 39 of them in the last 12 complete months (+18.2% year over year). Its most-permitted county is Reeves (88.8% of permits) and leading target is Permian Basin (59%).

39
permits, last 12 complete months
+18.2%
vs prior 12 months
366
permits, last 10 years
October 2026
most recent permit month

Permits by year

2017: 43 permits 2017 2018: 50 permits 2019: 23 permits 2019 2020: 8 permits 2021: 32 permits 2021 2022: 54 permits 2023: 35 permits 2023 2024: 53 permits 2025: 30 permits 2025 2026: 38 permits 2026
Vtx Energy Operating, LLC drilling permits per year (years with 3+ permits) (permits)
Vtx Energy Operating, LLC drilling permits per year (years with 3+ permits)
Periodpermits
201743
201850
201923
20208
202132
202254
202335
202453
202530
202638
YearPermitsMedian lateral (ft)
2017438,026
20185010,281
2019238,308
202088,429
2021329,366
20225410,221
2023358,489
20245310,867
20253011,042
20263810,451

Where it permits

CountyPermitsShare
Reeves (TX)32588.8%
Pecos (TX)4111.2%

What it targets

Formation / playPermitsShare
Permian Basin21659%
Avalon-Bone Spring15041%

Permit-to-production timing

Median permit → spud42 days
Median spud → first reported production133 days
Permits older than 12 months that were spudded99.7%
Spuds older than 12 months reporting production89.1%
Median lateral, last 24 months vs earlier10,720 ft vs 9,980 ft

Groups with fewer than three permits are folded into "all other". Computed by Valor from public oil and gas data; refreshed weekly. Data as of 2026-11-22.

Using this page

Vtx Energy Operating, LLC Permits — FAQ

Vtx Energy Operating, LLC has 366 Texas/Oklahoma drilling permits in the last ten years, 39 of them in the last 12 complete months (+18.2% year over year). Its most-permitted county is Reeves (88.8% of permits) and leading target is Permian Basin (59%).

Across its permits, the median time from permit to spud is 42 days and from spud to first reported production 133 days. 99.7% of its permits older than a year have been spudded.

Its median lateral on permits from the last 24 months is 10,720 ft, versus 9,980 ft on earlier permits (+7.4%).

No. Valor publishes permit activity as statistics — counts by year, county and formation groupings of three or more permits, lateral trends and cycle times — rather than individual permit records.

These statistics are computed by Valor from public oil and gas data. © Valor, all rights reserved.