(817) 370-0612

Cimarron Engineering, LLC Drilling Permit Activity

Quick answer: Cimarron Engineering, LLC has 81 Texas/Oklahoma drilling permits in the last ten years, 7 of them in the last 12 complete months (+40.0% year over year). Its most-permitted county is Jim Wells (34.6% of permits) and leading target is Gulf Coast Basin (La - Tx) (82.4%).

7
permits, last 12 complete months
+40.0%
vs prior 12 months
81
permits, last 10 years
August 2026
most recent permit month

Permits by year

2017: 4 permits 2017 2018: 5 permits 2019: 15 permits 2019 2020: 5 permits 2021: 13 permits 2021 2022: 9 permits 2023: 7 permits 2023 2024: 8 permits 2025: 6 permits 2025 2026: 5 permits 2026
Cimarron Engineering, LLC drilling permits per year (years with 3+ permits) (permits)
Cimarron Engineering, LLC drilling permits per year (years with 3+ permits)
Periodpermits
20174
20185
201915
20205
202113
20229
20237
20248
20256
20265
YearPermitsMedian lateral (ft)
20174132
20185132
201915132
20205132
202113131
20229129
20237134
20248134
20256134
20265—

Where it permits

CountyPermitsShare
Jim Wells (TX)2834.6%
Nueces (TX)1214.8%
Live Oak (TX)911.1%
Brazoria (TX)78.6%
Bee (TX)44.9%
Duval (TX)33.7%
Goliad (TX)33.7%
All other counties15—

What it targets

Formation / playPermitsShare
Gulf Coast Basin (La - Tx)5682.4%
Eagle Ford68.8%
Vicksburg45.9%
All other / unclassified2—

Permit-to-production timing

Median permit → spud27 days
Median spud → first reported production54 days
Permits older than 12 months that were spudded69.3%
Spuds older than 12 months reporting production69.2%
Median lateral, last 24 months vs earlier135 ft vs 132 ft

Groups with fewer than three permits are folded into "all other". Computed by Valor from public oil and gas data; refreshed weekly. Data as of 2026-09-29.

Using this page

Cimarron Engineering, LLC Permits — FAQ

Cimarron Engineering, LLC has 81 Texas/Oklahoma drilling permits in the last ten years, 7 of them in the last 12 complete months (+40.0% year over year). Its most-permitted county is Jim Wells (34.6% of permits) and leading target is Gulf Coast Basin (La - Tx) (82.4%).

Across its permits, the median time from permit to spud is 27 days and from spud to first reported production 54 days. 69.3% of its permits older than a year have been spudded.

Its median lateral on permits from the last 24 months is 135 ft, versus 132 ft on earlier permits (+2.3%).

No. Valor publishes permit activity as statistics — counts by year, county and formation groupings of three or more permits, lateral trends and cycle times — rather than individual permit records.

These statistics are computed by Valor from public oil and gas data. © Valor, all rights reserved.