(817) 370-0612

Wildfire Energy Operating LLC Drilling Permit Activity

Quick answer: Wildfire Energy Operating LLC has 665 Texas/Oklahoma drilling permits in the last ten years, 30 of them in the last 12 complete months (-18.9% year over year). Its most-permitted county is Burleson (53.8% of permits) and leading target is Austin Chalk (68.6%).

30
permits, last 12 complete months
-18.9%
vs prior 12 months
665
permits, last 10 years
September 2026
most recent permit month

The most recent permit month is the current, partial month, which the 12-month count does not include yet.

Permits by year

2017: 138 permits 2017 2018: 171 permits 2019: 140 permits 2019 2020: 43 permits 2021: 17 permits 2021 2022: 36 permits 2023: 31 permits 2023 2024: 24 permits 2025: 29 permits 2025 2026: 25 permits 2026
Wildfire Energy Operating LLC drilling permits per year (years with 3+ permits) (permits)
Wildfire Energy Operating LLC drilling permits per year (years with 3+ permits)
Periodpermits
2017138
2018171
2019140
202043
202117
202236
202331
202424
202529
202625
YearPermitsMedian lateral (ft)
20171386,895
20181717,701
20191407,970
2020437,691
2021178,252
2022368,463
2023319,460
20242410,179
20252910,612
2026259,114

Where it permits

CountyPermitsShare
Burleson (TX)35853.8%
Brazos (TX)17926.9%
Robertson (TX)497.4%
Madison (TX)466.9%
Washington (TX)253.8%
Lee (TX)71.1%
All other counties1—

What it targets

Formation / playPermitsShare
Austin Chalk45568.6%
Gulf Coast Basin (La - Tx)12518.9%
Gilmer Lime568.4%
East Texas Basin274.1%

Permit-to-production timing

Median permit → spud38 days
Median spud → first reported production84 days
Permits older than 12 months that were spudded98.9%
Spuds older than 12 months reporting production95.7%
Median lateral, last 24 months vs earlier9,870 ft vs 7,640 ft

Groups with fewer than three permits are folded into "all other". Computed by Valor from public oil and gas data; refreshed weekly. Data as of 2026-09-29.

Using this page

Wildfire Energy Operating LLC Permits — FAQ

Wildfire Energy Operating LLC has 665 Texas/Oklahoma drilling permits in the last ten years, 30 of them in the last 12 complete months (-18.9% year over year). Its most-permitted county is Burleson (53.8% of permits) and leading target is Austin Chalk (68.6%).

Across its permits, the median time from permit to spud is 38 days and from spud to first reported production 84 days. 98.9% of its permits older than a year have been spudded.

Its median lateral on permits from the last 24 months is 9,870 ft, versus 7,640 ft on earlier permits (+29.2%).

No. Valor publishes permit activity as statistics — counts by year, county and formation groupings of three or more permits, lateral trends and cycle times — rather than individual permit records.

These statistics are computed by Valor from public oil and gas data. © Valor, all rights reserved.