(817) 370-0612

Pilot Water Solutions Permianllc Drilling Permit Activity

Quick answer: Pilot Water Solutions Permianllc has 33 Texas/Oklahoma drilling permits in the last ten years, 2 of them in the last 12 complete months (— year over year). Its most-permitted county is Reeves (30.3% of permits) and leading target is Permian Basin (45.2%).

2
permits, last 12 complete months
—
vs prior 12 months
33
permits, last 10 years
May 2026
most recent permit month

Permits by year

2017: 5 permits 2017 2018: 3 permits 2018 2019: 14 permits 2019 2021: 3 permits 2021 2024: 4 permits 2024
Pilot Water Solutions Permianllc drilling permits per year (years with 3+ permits) (permits)
Pilot Water Solutions Permianllc drilling permits per year (years with 3+ permits)
Periodpermits
20175
20183
201914
20213
20244
YearPermitsMedian lateral (ft)
201754,038
201834,676
201914152
20213—
20244—
Other years combined (2 years)4—

Years with fewer than three permits are combined with at least one other year, so no single year's count is published.

Where it permits

CountyPermitsShare
Reeves (TX)1030.3%
Midland (TX)39.1%
Reagan (TX)39.1%
Winkler (TX)39.1%
All other counties14—

What it targets

Formation / playPermitsShare
Permian Basin1445.2%
Avalon-Bone Spring825.8%
Thirty-One Carbonate-Chert516.1%
All other / unclassified4—

Permit-to-production timing

Median permit → spud48 days
Median spud → first reported production— days
Permits older than 12 months that were spudded80.6%
Spuds older than 12 months reporting production16%
Median lateral, last 24 months vs earlier— ft vs 153 ft

Groups with fewer than three permits are folded into "all other". Computed by Valor from public oil and gas data; refreshed weekly. Data as of 2026-09-29.

Using this page

Pilot Water Solutions Permianllc Permits — FAQ

Pilot Water Solutions Permianllc has 33 Texas/Oklahoma drilling permits in the last ten years, 2 of them in the last 12 complete months (— year over year). Its most-permitted county is Reeves (30.3% of permits) and leading target is Permian Basin (45.2%).

Across its permits, the median time from permit to spud is 48 days and from spud to first reported production — days. 80.6% of its permits older than a year have been spudded.

There are not enough permits with a recorded lateral length to compute a trend.

No. Valor publishes permit activity as statistics — counts by year, county and formation groupings of three or more permits, lateral trends and cycle times — rather than individual permit records.

These statistics are computed by Valor from public oil and gas data. © Valor, all rights reserved.