Waterbridge Texas Operating LLC Drilling Permit Activity

Quick answer: Waterbridge Texas Operating LLC has 64 Texas/Oklahoma drilling permits in the last ten years, 0 of them in the last 12 complete months (— year over year). Its most-permitted county is Reeves (68.8% of permits) and leading target is Avalon-Bone Spring (72.9%).

0
permits, last 12 complete months
—
vs prior 12 months
64
permits, last 10 years
October 2024
most recent permit month

Permits by year

2017: 13 permits 2017 2018: 21 permits 2018 2019: 9 permits 2019 2021: 4 permits 2021 2022: 6 permits 2022 2023: 4 permits 2023
Waterbridge Texas Operating LLC drilling permits per year (years with 3+ permits) (permits)
Waterbridge Texas Operating LLC drilling permits per year (years with 3+ permits)
Periodpermits
201713
201821
20199
20214
20226
20234
YearPermitsMedian lateral (ft)
201713752
2018211,166
20199152
202141,120
20226770
20234—
Other years combined (2 years)4—

Years with fewer than three permits are combined with at least one other year, so no single year's count is published.

Where it permits

CountyPermitsShare
Reeves (TX)4468.8%
Ward (TX)1523.4%
Pecos (TX)34.7%
All other counties2—

What it targets

Formation / playPermitsShare
Avalon-Bone Spring4372.9%
Permian Basin1525.4%
All other / unclassified1—

Permit-to-production timing

Median permit → spud47 days
Median spud → first reported production— days
Permits older than 12 months that were spudded82.8%
Spuds older than 12 months reporting production1.9%
Median lateral, last 24 months vs earlier— ft vs 720 ft

Groups with fewer than three permits are folded into "all other". Computed by Valor from public oil and gas data; refreshed weekly. Data as of 2026-11-01.

Using this page

Waterbridge Texas Operating LLC Permits — FAQ

Waterbridge Texas Operating LLC has 64 Texas/Oklahoma drilling permits in the last ten years, 0 of them in the last 12 complete months (— year over year). Its most-permitted county is Reeves (68.8% of permits) and leading target is Avalon-Bone Spring (72.9%).

Across its permits, the median time from permit to spud is 47 days and from spud to first reported production — days. 82.8% of its permits older than a year have been spudded.

There are not enough permits with a recorded lateral length to compute a trend.

No. Valor publishes permit activity as statistics — counts by year, county and formation groupings of three or more permits, lateral trends and cycle times — rather than individual permit records.

These statistics are computed by Valor from public oil and gas data. © Valor, all rights reserved.